We are active in all phases of rail projects, including: system planning, alternatives analysis, EIA, noise and vibration measurements and assessments, testing and analysis of trackform components, trackform vibration isolation design, commissioning tests, etc.
We provide noise and vibration control solutions to existing and planned railway lines in Hong Kong as well as in Taiwan, Macau and Bangkok.
Current active projects include:
- Express Rail Link (XRL) 830 Tendering Support – Advise IST Construction Procedures and Propose Alternative Vibration Isolation Trackform, 2010
- Bangkok Red Line North – Rail Noise Assessment and Tendering Supports for Toyo Engineering, 2010
- Macau LRT C270 Design Consultancy EIA Review, 2010 - Present
- MTRC – Force Density Level Measurement for 2 types of Locomotives, 2010
- MTRC Tsuen Wan Depot Fan Area Noise Investigation using Beamforming techniques, 2010 - Present
- MTRC Network Saloon Noise Measurements for 9 Railway Lines, 2010 - Present
- MTRC Shatin Central Line (SCL) C1101 – Feasibility Study of Acoustic Performance of Platform Screen Doors system at HIK Station, 2010 - Present
- MTRC Shatin Central Line (SCL) C1101 – Finite Element Analysis of Viaduct Re-Radiated Noise, 2010 - Present
- Development of Rail Tuned Mass Damper for Rail Noise Control, 2007- Present
- MTRC Shatin Central Line (SCL) EIA – Airborne and Groundborne Noise Assessments and Mitigation Design, 2008 - Present