Our professionals have been working for more than 150 construction sites for control of construction noise and successful construction noise permit applications at critical conditions. We are specialised in tunnelling work construction noise and vibration control. We have extensive ground vibration data excited by operation of Tunnel Boring Machine (TBM).
We provide precise ground vibration measurement and prediction of structure-borne noise levels for TBM induced ground borne noise and vibration.
Relevant Published Papers including:
-Wilson Ho, Alan Crockett and Andy Raine., (2006), Measurement and Prediction of Groundborne Noise and Vibration from a Tunnel Boring Machine, Technical Acoustics, Vol.25: No.6
-Sam Tsoi, Wilson Ho, Glenn Frommer, Nick Antonio, (2001), Railway Groundborne Noise Prediction through Vibration Measurements of a Tunnel Boring Machine, Proceedings of the 8th International Conference of Sound and Vibration, p1173-1180.
-Isaac Ng, Edmond Wong and Wilson Ho, (2001), Co-existence of Construction Work and Tranquillity - A Myth or Reality, Proceedings of the 8th International Conference of Sound and Vibration, p1509-1516.
Awarded Paper:
-Ken Kwok, Andy Raine, Adman Chu, Wilson Ho, (2009), Green Cable Tunnel Construction at Castle Peak, Environmental Paper Award, HKIE
Job Reference:
-MTR XRL 820 - CNP Assessmenet
-MTR XRL 821 - Noise Measurement
-MTR XRL 822 - 24-Hr CNP
-DSD HATS 2A - CNP Assessment
-MTR WIL 703 - 24-Hr CNP Assessment
-MTR WIL 705 - 24-Hr CNP Assessment
-MTR WIL 708 - 24-Hr CNP Assessment
-Lai Chi Kok - Transfer Scheme 24-Hr CNP
-Lai Chi Kok TBM GBN CNP Application
-Castle Peak Cable Tunnel - TBM Groundborne Noise Assessment and CNP Application
-Castle Peak - TBM CNP (LRL Crossing)
-HKWDT - CNP Assessment